LEVEL 3 GUIDANCE - Section: 03.170.SHE
Prepared By: K Winder
Approved By: T Chambers
Date: Sept 1995 - Rev: 0 - ISSUE 1

The Construction (Design and Management)
Regulations 1994
CDM Part 1

 

1. CLIENT DETAILS

  • 1.1 CLIENT NAME
  • 1.2 CLIENT ADDRESS
Group Head Office

 

Telephone No:

Fax No:

Site

 

Telephone Number:

Fax No:

 

 2. PROJECT DETAILS

2.1 PROJECT DURATION

 

2.2 PROJECT ADDRESS

 

2.3 PROJECT DESCRIPTION

 

Civil Work

 

Building Work

 

Engineering

(Tankage)

 

 

(Pipework)

 

 

Electrical

 

 

 

3. EXISTING ENVIRONMENT

 

3.1 MATERIALS

 

3.1.1 Asbestos see section 2.

 

3.1.2 Pipework which has contained flammable liquids.

 

3.2 SURROUNDING LAND

 

3.2.1

3.2.2

3.2.3

3.2.4

3.2.5

3.2.6

3.3 TRAFFIC FLOW

 

3.3.1

3.3.2

3.3.3

3.4 EXISTING STRUCTURE

 

3.4.1

3.4.2

3.4.3

3.5 SERVICES

3.5.1 See Section 2

 

  