| 1.
HEATING :- | | |
| Boilers | | |
| Are
the required safety checks carried out and recorded? | Yes | No
|
| Are
fusible link cut offs operative ? | Yes | No
|
| Space
Heaters | | |
| Are
fusible link devices operative? | Yes | No
|
| Is
stock and/or work in progress at least 1 metre from the heater? | Yes | No
|
Portable
Heaters Portable heaters should not be used without
prior approval. | | |
| Oil
Tanks | | |
| All
oil tanks should be bunded ( catchpit) | Yes | No
|
| Are
the bunds clear of debris? | Yes | No
|
| Are
drain valves fitted to remove waste liquids? | Yes | No
|
| Are
the valves on the oil tanks locked off to prevent tampering? | Yes | No
|
| LPG
Storage Tanks | | |
| Are
they fenced off? | Yes | No
|
| Is
the tank earthed? | Yes | No
|
| Are
earthing clips available? | Yes | No
|
| | |
| 2.
SMOKING | | |
| Are
smoking rules observed? | Yes | No
|
| Where
smoking is allowed , are there sufficient receptacles? | Yes | No
|
| Are
they used? | Yes | No
|
| | |
| 3.
MAINTENANCE/ENGINEERS | | |
| Flammable
liquids | | |
| Are
flammable liquids stored in fire resisting cabinets /bins? | Yes | No
|
| Are
approved containers in use? | Yes | No
|
| Are
all flammable liquids returned to store at the end of the shift? | Yes | No
|
| Are
lidded metal bins provided for waste material? | Yes | No
|
| Gases | |
|
| Are
all cylinders properly secured in the work place? | Yes | No
|
| Is
a locked compound provided for storage? | Yes | No
|
| Are
LPG cylinders separated from the rest? | Yes | No
|
| Are
spark arrestors fitted on cutting equipment? | Yes | No
|
| Is
the Hot Work permit observed? | Yes | No
|
| Is
ammonia detection provided and working? | Yes | No
|
| | |
| 4.
SECURITY | | |
Are
fences and gates in good condition with no damage creating access points?
| Yes | No
|
| Are
gates locked or manned out of hours? | Yes | No
|
| Are
all windows, doors locked out of hours? | Yes | No
|
Are
doors to storage areas, packaging stores and dry goods kept closed at all
times as a matter of policy? | Yes | No
|
| Is
the intruder alarm working and 'on' out of hours? | Yes | No
|
| | |
| 5.
HOUSEKEEPING | | |
| Internal | | |
| Are
storage areas tidy with no stock on the floor obstructing aisles? | Yes | No
|
| Is
stock clear of electrical equipment , heaters and battery chargers? | Yes | No
|
| Is
all waste removed outside the buildings daily? | Yes | No
|
| External | | |
| Are
waste bins and skips tidy and secure against tampering? | Yes | No
|
| Are
waste skips at least 10 metres away from buildings? | Yes | No
|
| Are
pallets stored at a least 10 metres from external building walls | Yes | No
|
| Are
canopies , loading bays and lean-to areas clear of stock ( other than that being
immediately taken in or out of the buildings). | Yes | No
|
| | |
| 6.
ELECTRICS | | |
| Are
switch rooms locked and secure? | Yes | No
|
| Are
switch rooms clear of all non related materials? | Yes | No
|
| Are
switch boards kept clear of stock? | Yes | No
|
| Are
there any trailing leads, temporary wiring that require attention? | Yes | No
|
| | |
| 7.
PROCESS | | |
| Ovens | | |
| Are
maintenance schedules being observed? | Yes | No
|
| Are
extract ducts and oven beds cleaned on a regular cycle? | Yes | No
|
| Fryers | | |
| Are
maintenance procedures and schedules observed and up to date? | Yes | No
|
| Are
overheat warning sytems operative ? | Yes | No
|
| Are
extraction ducts and filters cleaned on a regular cycle? | Yes | No
|
| Is
fixed fire protection on a maintenance contract? | Yes | No
|
| Are
fire protection systems indicating healthy? | Yes | No
|
| Are
there any ovens or fryers within 3 metres of wall or ceiling panels constructed
of polystyrene or polyurethane. Such materials should be replaced by approved
construction material or over clad with fire resisting material. | Yes | No
|
| Kitchens | | |
| Are
filters over cooking equipment particularly fryers cleaned or replaced on an acceptable
frequency? | Yes | No
|
| Are
first aid fire appliances provided ? | Yes | No
|
| | |
| 8.
PREMISES | | |
Is
there any damage to wall and ceiling panels? Any such damage should be repaired
promptly. | Yes | No
|
| Are
roof spaces clear of all unnecessary materials? | Yes | No
|
| Is
there any exposed polystyrene requiring capping? | Yes | No
|
| Is
all packing material stored in a tidy fashion? | Yes | No
|
| | |
| 9.
FIRE PROTECTION | | |
| Alarm | | |
| Is
the fire alarm panel indicating healthy? | Yes | No
|
| Are
the panel lamps all working? | Yes | No
|
| Is
any signalling to central station or gatehouse operative? | Yes | No
|
| Extinguishers | | |
| All
available and accessible? | Yes | No
|
| Hose
Reels | | |
| Maintenance
contracts in force and up to date? | Yes | No
|
| Location
notices provided? | Yes | No
|
| Nozzles
present on hose reels? | Yes | No
|
| Fire
Doors | | |
| Self
closing devices working? | Yes | No
|
| Doors
not obstructed? | Yes | No
|
| Sprinklers
where appropriate. | | |
| Weekly
alarm test carried out? | Yes | No
|
| Pump
tested weekly? | Yes | No
|
| Test
card marked up to date? | Yes | No
|
| Valves
strapped and padlocked? | Yes | No
|
| | |